Kagaznama

Fill in your details

Landlord's Scope of Work Annexure (Bare Shell / Warm Shell)

Answer the questions. Your document builds itself as you type.

Your answers

Nothing answered yet. There are 6 questions on this form.

Still to answer: 6 questions left.

Nothing is amiss in what you have written. The document is simply not finished, and the draft marks each gap where an answer will go.

  1. The landlord, the tenant and the lease
  2. What condition the premises are handed over in
  3. Services and finishes the landlord provides
  4. Handover date, delay and snags

Step 1 of 4

The landlord, the tenant and the lease

For example: Sethi Estates Private Limited

Landlord's addressNeeded

For example: Northline Analytics Private Limited

Tenant's registered or business addressNeeded
The premises (unit, floor, building and address)Needed

For example: Commercial Lease Deed dated 1 April 2026

About this document

Answer what you can. The draft beside these boxes is rewritten as you go, so you can see exactly what each answer does to the document.

What you type stays in this browser. Each new step is drawn by this site, which keeps nothing. Closing this tab loses it, so keep a copy.

Read the whole draft
The live draft

The draft, as it stands

Your document, updating as you type. Blank lines fill in as you answer.

LANDLORD'S SCOPE OF WORK ANNEXURE

  1. 1. STANDARD OF HANDOVER

1.2 The works the Landlord carries out under this Annexure are called the "Landlord's Works". Everything the Tenant does inside the Premises after possession is the Tenant's fit-out, which is outside this Annexure and is the Tenant's cost unless the Lease says otherwise.

  1. 2. WHAT THE LANDLORD PROVIDES

2.7 The Landlord shall carry out the Landlord's Works in a workmanlike manner, with sound materials, in line with the sanctioned plans and the requirements of the authority that governs the building, and shall keep the Tenant informed of progress when the Tenant asks.

4.4 A delay caused by the Tenant, or by something the Tenant was asked to do and did not do, does not count against the Landlord for the purpose of clause 4.3.

  1. 5. HANDOVER AND SNAGGING

5.1 On handover the Parties shall walk through the Premises together and the Landlord shall give the Tenant written notice that the Landlord's Works are complete. A short signed note of the walk-through, with photographs, is enough.

5.3 Handing over possession, and the Tenant starting its fit-out, does not take away the Tenant's right to the defects list in clause 5.2.

  1. 6. GENERAL

6.1 This Annexure is part of the Lease. If it conflicts with the Lease on the Landlord's Works, this Annexure governs for that purpose and the Lease governs on everything else.

6.2 Changes to the Landlord's Works need the written agreement of both Parties.

FOR THE LANDLORD
__________
Signature: ______________________________

FOR THE TENANT
__________
Signature: ______________________________

The rest stays out of view until every answer is in.

KAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINAL

Free to read. Free account to download.

Read the whole draft here without an account. To download or print a clean copy, create a free account.

Carry on reading without one

Back to what this document is