Kagaznama

Fill in your details

Section 118: Extension of Time to Use Land

Answer what you can. The draft updates live.

Your answers

Nothing answered yet. There are 8 questions on this form.

Still to answer: 8 answers are still to come.

Nothing is amiss in what you have written. The document is simply not finished, and the draft marks each gap where an answer will go.

  1. The permission
  2. What has been done
  3. Your request

Step 1 of 3

The permission

For example: Kangra

For example: Karan Mehta

For example: son of Late Sh. Ramesh Mehta

What is your address?Needed

For example: Order No. 118/2025/412 dated 10 June 2025

A long answer. Several lines are fine, and a break you make between paragraphs is the break the document keeps.

For example: Mauza Barot, Tehsil Baijnath, Khasra No. 212/1, 0-08-05 hectares

For example: construction of a dwelling house

For example: two years from the date of the order, ending on 9 June 2027

About this document

Answer what you can. The draft beside these boxes is rewritten as you go, so you can see exactly what each answer does to the document.

What you type stays in this browser. Moving to a new step asks this site to draw it, but nothing is kept anywhere until you choose to keep a copy — and closing this tab loses it.

Read the whole draft

Clearing empties every box on this form, and there is no way back to what was in them.

The live draft

The draft, as it stands

This is the document as far as you have reached, not the whole of it yet — the rest appears as you answer more questions. It is rewritten every time you change an answer.

A long blank line — __________ — stands wherever an answer has not been given. It is left that visible on purpose, so an unfinished document cannot be mistaken for a finished one.

No answer has been given, so every place a detail belongs is standing blank. The shape of the document is worth reading even now.

APPLICATION FOR EXTENSION OF TIME UNDER SECTION 118 PERMISSION

To,
The Collector,
__________, Himachal Pradesh.

Subject: Application for more time to use land bought under the permission granted under section 118 of the Himachal Pradesh Tenancy and Land Reforms Act, 1972.

Respected Sir/Madam,

1. The applicant

1.1 I, __________, __________, resident of __________, respectfully state as follows.

2. The permission

2.1 I bought land in __________ district under permission given by the order __________ under section 118 of the Himachal Pradesh Tenancy and Land Reforms Act, 1972. The land is:

__________

2.2 The permission was given for __________.

2.3 The time given in the order is: __________.

3. What has been done

3.2 What has been done so far is:

4. Why more time is needed

4.1 The work could not be finished in the time allowed for these reasons:

4.2 I have not put the land to any use other than the use permitted, and I have not sold, leased or otherwise parted with it.

5. Papers enclosed

5.1 I enclose:

6. Prayer

Signature: ______________________________
__________

Verification

I, __________, verify that the statements in paragraphs 1 to 5 are true and correct to my knowledge and belief, that nothing material is concealed, and that no part of this application is false.

Signature: ______________________________
__________

The rest stays out of view until every answer is in.

KAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINAL

Reading costs nothing. Keeping a copy needs an account.

The opening of the draft is on this page as you answer it. Once every answer is in, the button below opens the whole draft, watermarked — still without an account. Printing it, or keeping a clean copy, is where an account is asked for. That is the whole arrangement.

A kept copy has to belong to somebody, and that is the reason for the account. There is nothing further to it.

Continue to download

Carry on reading without one

Back to what this document is

We've updated our Terms

Please read the updated documents below and accept them once to keep taking documents away and buying kits. Browsing, filling in and previewing a document are not affected.