Kagaznama

Fill in your details

Structural Engineer Appointment

Answer the questions. Your document builds itself as you type.

Your answers

Nothing answered yet. There are 4 questions on this form.

Still to answer: 4 questions left.

Nothing is amiss in what you have written. The document is simply not finished, and the draft marks each gap where an answer will go.

  1. The Owner and the Engineer
  2. The structure and the services
  3. Fee and payment
  4. Disputes and signing

Step 1 of 4

The Owner and the Engineer

For example: Simran Gill

Owner's addressNeeded

For example: Er. Harpreet Singh

Structural Engineer's address or officeNeeded
More details — you may leave these
About this document

Answer what you can. The draft beside these boxes is rewritten as you go, so you can see exactly what each answer does to the document.

What you type stays in this browser. Each new step is drawn by this site, which keeps nothing. Closing this tab loses it, so keep a copy.

Read the whole draft
The live draft

The draft, as it stands

Your document, updating as you type. Blank lines fill in as you answer.

STRUCTURAL ENGINEER APPOINTMENT

BETWEEN

__________, resident of __________ ("the Owner"),

AND

__________, of __________ ("the Engineer").

1. THE PROJECT

2. SERVICES

2.3 The Engineer shall design to the standards and codes of practice that apply to the structure, and shall state in the drawings the standards and design loads used. The Owner shall tell the Engineer in writing if the intended use of the structure, the number of floors or the loads will differ from the description in clause 1.2.

2.5 A site inspection under this Agreement is a periodic check of the structural work at the stage named. It is not full-time supervision of the Contractor, and the Contractor remains solely responsible for how the work is done, the quality of materials and the safety of workmen.

2.8 The Engineer's certificate is an independent professional opinion. The Engineer is not bound to issue it if an inspection has been missed, if the work departs from the structural drawings without the Engineer's written agreement, or if a defect found has not been corrected. The Owner shall not ask the Engineer to certify anything the Engineer has not inspected.

2.9 The Engineer shall exercise the reasonable skill and care expected of a qualified structural engineer. Any change to the structure made after the structural drawings are issued, including added floors, removed walls or columns, or a change of use, shall be made only after the Engineer has agreed to it in writing. The Engineer is not responsible for a change made without that agreement.

3. FEE AND PAYMENT

4. DRAWINGS AND COPYRIGHT

4.1 Copyright in the structural design and drawings remains with the Engineer, but the Owner is granted an irrevocable licence to use them for the construction, maintenance and any lawful extension of the structure described above, on payment of the fee due under this Agreement.

4.2 The Engineer is not responsible for any use of the design or drawings for a different site or a materially different structure without the Engineer's written consent.

5. TERMINATION

5.1 Either Party may terminate this Agreement on fourteen days' written notice. On termination, the Owner shall pay for services rendered up to the date of termination, and the Engineer shall hand over the design, drawings, inspection records and calculations prepared up to that date.

6. DISPUTE RESOLUTION

7. GENERAL

7.1 This Agreement is the entire understanding between the Parties on the services described above.

OWNER

_________________
__________

ENGINEER

_________________
__________

The rest stays out of view until every answer is in.

KAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINAL

Free to read. Free account to download.

Read the whole draft here without an account. To download or print a clean copy, create a free account.

Carry on reading without one

Back to what this document is