Trade Work Order (Electrical / Plumbing / Tile / Paint)

Answer the questions. Your document builds itself as you type.

Your answers

Nothing answered yet. There are 4 questions on this form.

Still to answer: 4 questions left.

Nothing is amiss in what you have written. The document is simply not finished, and the draft marks each gap where an answer will go.

  1. The Owner and the Contractor
  2. The trade, the site and the work
  3. Rate and payment
  4. Time, defects and safety
  5. Signing

Step 1 of 5

The Owner and the Contractor

For example: Gurpreet Singh

Owner's addressNeeded

For example: Harjit Electricals

Contractor's address or officeNeeded
More details — you may leave these

For example: GST 03ABCDE1234F1Z5

About this document

Answer what you can. The draft beside these boxes is rewritten as you go, so you can see exactly what each answer does to the document.

What you type stays in this browser. Each new step is drawn by this site, which keeps nothing. Closing this tab loses it, so keep a copy.

Read the whole draft
The live draft

The draft, as it stands

Your document, updating as you type. Blank lines fill in as you answer.

BETWEEN

__________, resident of __________ ("the Owner"), of the ONE PART;

AND

__________, of __________ ("the Contractor", which expression shall include its partners, legal representatives and permitted assigns), of the OTHER PART.

1. THE WORK

1.5 Materials shall be of the make, grade and specification agreed in writing between the Parties. The Owner or the Owner's representative may inspect materials and workmanship at any reasonable time before they are fixed, laid or applied.

1.6 The Contractor shall carry out the Work with competent workers and shall hold any licence, registration or permission that applies to this trade for work of this kind. The finished Work shall be tested or inspected in the Owner's presence before handover.

2. RATE AND PAYMENT

3. TIME FOR COMPLETION

4. DEFECT LIABILITY

5. INSURANCE, SAFETY AND LABOUR

5.2 The Contractor is solely responsible for the safety of its workmen and for compliance with applicable labour law in respect of their wages, provident fund, employees' state insurance and any welfare cess, and shall keep the Owner indemnified against any claim arising from the Contractor's failure to do so.

6. TERMINATION

6.1 Either Party may terminate this Work Order on a material breach by the other that remains uncured for fifteen days after written notice, without prejudice to any amount already due.

7. DISPUTE RESOLUTION

8. GENERAL

8.1 This Work Order is the entire agreement between the Parties on the Work. Any extra or changed work, or any change of time or price, shall be valid only if recorded in writing and signed by both Parties.

OWNER

_________________
__________

CONTRACTOR

_________________
__________

WITNESSES

  1. 1. _________________
  1. 2. _________________

The rest stays out of view until every answer is in.

KAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINALKAGAZNAMA — PREVIEW, NOT FINAL

Free to read. Free account to download.

Read the whole draft here without an account. To download or print a clean copy, create a free account.

Carry on reading without one

Back to what this document is