DEMOLITION PERMISSION APPLICATION
Applicant: __________, __________, capacity __________..
- 1. DEMOLITION
- 2. OCCUPANCY AND UTILITIES
- 3. METHOD AND STRUCTURAL SAFETY
- 4. HAZARDOUS MATERIAL AND DEBRIS
- 5. TREES / PUBLIC SPACE / REDEVELOPMENT
- 6. PROFESSIONALS
- 7. ENCLOSURES
- 8. REQUEST
Please grant the applicable demolition permission/acknowledgment subject to utility isolation, structural/safety controls, public protection, lawful waste disposal and any separate tree or road-occupation permission required.
PERSONAL DATA NOTICE
This notice is given under the Digital Personal Data Protection Act, 2023.
Personal data in this document is collected only to prepare, submit and administer the demolition-permission application for the identified building or portion, communicate about that purpose, verify expressly supplied property and approval information, and retain an evidentiary application record.
The record will be held by __________ and may be shared only with the applicant, owner, architect, engineer, licensed professional, project consultant, lender, contractor, competent planning/building/fire/environment/water authority, or other person directly involved in the stated approval.
If the application is withdrawn, refused or does not proceed, personal data will be retained for 90 days and then erased. If it proceeds, the record will be retained for the approval/project plus 12 months, except where a statute or authority record-retention rule requires a longer named period.
Data minimisation: this document does not collect a full Aadhaar number, an Aadhaar-card copy, a password or unrelated financial credentials, and none should be written into it. Collect identity and professional-registration details only where the receiving authority actually requires them.
Record-holder: __________
SIGNATURE
______________________________
Signature
Applicant: __________
Place: ____________________
Date: ____________________