Kagaznama

Building Plan Sanction Application

At a glance

Price
Free
Stamp duty
No stamp duty: it creates no right in property, so it is not an instrument under section 2(14), Indian Stamp Act, 1899.
Registration
Not registrable: creates no right in property; section 17, Registration Act, 1908 doesn't apply.
Witnesses
Not required.

Free

Documents are free. Only kits are paid.

Free: up to 5 documents a day.

Guided questions, full draft on screen, download in Word.

See all prices

Also called

  • building permit application
  • building plan approval application
  • E-Naksha building sanction request

When you need it

You need the authority's sanctioned plan before erecting, adding to or altering a building. Chandigarh Building Rules (Urban), 2017 set the required forms and drawings, filed online; Punjab uses the local building-permit/E-Naksha route.

Read more

Sanction isn't a title certificate nor authority for a prohibited use; deviations need a revised plan.

Whether you can fill this in here

You can fill this in here

You can fill this one in on this site, and read the whole draft on screen before you decide anything about it. It is a carefully drafted template; it is not advice about your own facts.

Fill this one in
See stamp duty, registration and witnesses

What follows is written for Punjab and Chandigarh. It states the position there rather than describing how it varies, so the amounts below are the ones that apply — worth confirming at the sub-registrar’s office, because rates change. If the property is anywhere else in India, none of this is yours.

Stamp duty

No stamp duty: it creates no right in property, so it is not an instrument under section 2(14), Indian Stamp Act, 1899. Print on plain paper; pay only the authority's fee. Any affidavit filed is stamped separately.

Registration

Not registrable: creates no right in property; section 17, Registration Act, 1908 doesn't apply.

Notarisation

Not required, unless the authority asks for an affidavit.

Witnesses

Not required. The owner's and the professional's signatures suffice.

Request Stamp Paper

Sample preview — placeholder answers, not your data

BUILDING PLAN SANCTION APPLICATION

Application date: 1 April 2026

Applicant: Aarav Sharma, Sector 21, Panchkula; capacity Owner/allottee. Phone: 98765 43210; email: aarav@example.com.

Site: Plot 118, Sector 66, SAS Nagar, Punjab (Residential plot/building), Plot 118, Sector 66; allotment AL-118., site area 836.13 sq m. Title/allotment: Conveyance deed no. 2345 dated 10 June 2022. Jurisdiction: Punjab; authority: GMADA / competent building authority.

  1. 1. PROPOSED WORK

Work: New building. Use: Commercial office building.. Ground coverage: 320 sq m. Total built-up area: 960 sq m. Floors: 3. Height: 11.8 m. Basement: No basement proposed.

  1. 2. PLANNING CONTROLS

Zoning/control status: Plans follow applicable zoning/architectural controls. Parking: On-site parking as required by applicable rules. Ownership documents: Title/allotment document attached.

  1. 3. ENGINEERING AND SERVICES

Structural design: Structural drawings prepared and signed by qualified engineer. Fire design: Fire-safety design attached where required. Public-health plan: Water/sewer/drainage services plan attached. Energy/environment: Applicable energy/environment forms incorporated.

  1. 4. PROFESSIONALS

Architect: Ar. Simran Kaur (CA/2012/55555). Structural engineer: Er. Neeraj Khanna (SE/CHD/2024/118).

  1. 5. SUBMISSION

Drawing/form schedule: Site plan; floor plans; elevations; sections; structural drawings; services drawings.. Fee status: Paid. Reference: ENAKSHA-260915-118

  1. 6. REQUEST

Please scrutinise and sanction the plans for the stated work subject to applicable zoning, building, structural, fire, public-health and other approval conditions.

LEGAL BASIS

In Chandigarh building plans are filed on the Online Building Plan Approval System at obps.chandigarhsmartcity.in. Under the Estate Officer's Public Notice effective 10 February 2023, which followed the Supreme Court's judgment of 10 January 2023, the Estate Office entertains building plans and revised building plans for a residential property with more than one owner only where all the co-owners belong to the same family. In Punjab, on a site allotted by a development authority under the Punjab Regional and Town Planning and Development Act, 1995, a sanction of building plans is given only to the allottee on the authority's file, and the completion certificate is issued under rule 14 and the occupation certificate under rule 23 of the Punjab Urban Planning and Development Building Rules, 2021, by the municipal corporation, council or development authority concerned.

PERSONAL DATA NOTICE

This notice is given under the Digital Personal Data Protection Act, 2023.

Personal data in this document is collected only to prepare, submit and administer the building-plan sanction application, communicate about that purpose, verify expressly supplied property and approval information, and retain an evidentiary application record.

Questions about this document

Does the Building Plan Sanction Application need stamp paper or stamp duty in Punjab and Chandigarh?

No stamp duty: it creates no right in property, so it is not an instrument under section 2(14), Indian Stamp Act, 1899.

See the full position on stamp duty, registration and witnesses
Does the Building Plan Sanction Application need registration in Punjab and Chandigarh?

Not registrable: creates no right in property; section 17, Registration Act, 1908 doesn't apply.

See the full position on stamp duty, registration and witnesses
What does the Building Plan Sanction Application cost on Kagaznama?

Free.

Documents are free. Only kits are paid.

Does the Building Plan Sanction Application need witnesses?

Often needed with this document

Back to Land records, title checks and approvals

We've updated our Terms

Please read the updated documents below and accept them once to keep taking documents away and buying kits. Browsing, filling in and previewing a document are not affected.