Kagaznama

Completion Certificate Application

At a glance

Price
Free
Stamp duty
No stamp duty: it creates no right in property, so it is not an instrument under section 2(14), Indian Stamp Act, 1899.
Registration
Not registrable: creates no right in property; section 17, Registration Act, 1908 doesn't apply.
Witnesses
Not required.

Free

Documents are free. Kits are free during our launch.

Free: up to 5 documents a day.

Guided questions, full draft on screen, download in Word.

See all prices

Also called

  • building completion certificate request
  • completion plan application
  • construction completion approval

When you need it

Once construction is complete, use this so the authority records the building matches the sanctioned plan, or departs only as lawfully acceptable. State the sanction, completion date and certifications. Not permission to occupy: Chandigarh requires non-compoundable violations removed first; Punjab runs a similar process.

Whether you can fill this in here

You can fill this in here

You can fill this one in on this site, and read the whole draft on screen before you decide anything about it. It is a carefully drafted template; it is not advice about your own facts.

Fill this one in
See stamp duty, registration and witnesses

What follows is written for Punjab and Chandigarh. It states the position there rather than describing how it varies, so the amounts below are the ones that apply — worth confirming at the sub-registrar’s office, because rates change. If the property is anywhere else in India, none of this is yours.

Stamp duty

No stamp duty: it creates no right in property, so it is not an instrument under section 2(14), Indian Stamp Act, 1899. Print on plain paper; pay only the authority's fee. Any affidavit filed is stamped separately.

Registration

Not registrable: creates no right in property; section 17, Registration Act, 1908 doesn't apply.

Notarisation

Not required, unless the authority asks for an affidavit.

Witnesses

Not required. The owner's and the professional's signatures suffice.

Request Stamp Paper

Sample preview — placeholder answers, not your data

COMPLETION CERTIFICATE APPLICATION

Application date: 2 April 2026

Applicant: Aarav Sharma, Sector 21, Panchkula, capacity Owner/allottee. Phone: 98765 43210; email: aarav@example.com.

Property: Plot 118, Sector 66, SAS Nagar, Punjab (Residential plot/building), Plot 118, Sector 66; allotment AL-118., site area 836.13 sq m. Title/allotment: Conveyance deed no. 2345 dated 10 June 2022. Jurisdiction Punjab; authority GMADA / competent building authority.

Sanction: BP/2025/118 dated 01 December 2025. Construction completion date: 1 April 2026.

  1. 1. COMPLETED WORK

Completed built-up area: 948 sq m. Floors: 3. Completion drawings: As-built completion plans match sanctioned plans. Departures: Internal partition change on second floor.

  1. 2. STRUCTURE AND SERVICES

Structural completion: Structural engineer certifies construction as per approved structural design. Services: Water/sewer/drainage installations completed. Pending service item: Final sewer connection inspection. Fire: Required fire systems installed and certification/NOC attached or pending final inspection. Site clearance: Construction debris removed and site safe.

  1. 3. PROFESSIONALS

Architect: Ar. Simran Kaur (CA/2012/55555). Structural engineer: Er. Neeraj Khanna (SE/CHD/2024/118).

  1. 4. ENCLOSURES

Completion documents: Completion drawings, architect certificate, structural certificate, service completion records.. Fee status: Paid. Reference: CC-260915-118

  1. 5. REQUEST

Please inspect the completed work and issue the completion certificate or identify the specific remedial, revised-plan, compounding or service action required before completion can be accepted.

LEGAL BASIS

In Punjab the completion certificate is issued under rule 14 and the occupation certificate under rule 23 of the Punjab Urban Planning and Development Building Rules, 2021, by the municipal corporation, council or development authority concerned. On a development-authority site, where the completion or occupation certificate is not obtained within the period allowed, the authority charges an extension fee half-yearly, on a ladder that starts in the fourth year from allotment and runs against the site rather than the person. In Chandigarh a building on an allotted or auctioned site must be completed within three years of the delivery of possession under Rule 8 of the Chandigarh Estate Rules, 2007, with up to five yearly extensions on a penalty of 10%, 15%, 20%, 25% and 30% of the total consideration, after which the Estate Officer may proceed under section 8-A of the Capital of Punjab (Development and Regulation) Act, 1952; the building is not to be occupied until the Estate Office issues an Occupation Certificate.

PERSONAL DATA NOTICE

This notice is given under the Digital Personal Data Protection Act, 2023.

Questions about this document

Does the Completion Certificate Application need stamp paper or stamp duty in Punjab and Chandigarh?

No stamp duty: it creates no right in property, so it is not an instrument under section 2(14), Indian Stamp Act, 1899.

See the full position on stamp duty, registration and witnesses
Does the Completion Certificate Application need registration in Punjab and Chandigarh?

Not registrable: creates no right in property; section 17, Registration Act, 1908 doesn't apply.

See the full position on stamp duty, registration and witnesses
What does the Completion Certificate Application cost on Kagaznama?

Free.

Documents are free. Kits are free during our launch.

Does the Completion Certificate Application need witnesses?

Often needed with this document

Back to Land records, title checks and approvals

We've updated our Terms

Please read the updated documents below and accept them once to keep taking documents away and buying kits. Browsing, filling in and previewing a document are not affected.