ਕਾਗਜ਼ਨਾਮਾ

Completion Certificate Application

ਇੱਕ ਨਜ਼ਰ ਵਿੱਚ

ਕੀਮਤ
ਮੁਫ਼ਤ
ਸਟਾਂਪ ਡਿਊਟੀ
No stamp duty: it creates no right in property, so it is not an instrument under section 2(14), Indian Stamp Act, 1899.
ਰਜਿਸਟਰੀ
Not registrable: creates no right in property; section 17, Registration Act, 1908 doesn't apply.
ਗਵਾਹ
Not required.

ਮੁਫ਼ਤ

ਦਸਤਾਵੇਜ਼ ਮੁਫ਼ਤ ਹਨ। ਕਿੱਟਾਂ ਸਾਡੇ ਲਾਂਚ ਦੌਰਾਨ ਮੁਫ਼ਤ ਹਨ।

ਮੁਫ਼ਤ: ਇੱਕ ਦਿਨ ਵਿੱਚ 5 ਦਸਤਾਵੇਜ਼ ਤੱਕ।

ਆਸਾਨ ਸਵਾਲ, ਪੂਰਾ ਡਰਾਫਟ ਸਕ੍ਰੀਨ ਉੱਤੇ, Word ਵਿੱਚ ਡਾਊਨਲੋਡ ਕਰੋ।

ਸਾਰੀਆਂ ਕੀਮਤਾਂ ਵੇਖੋ

ਇਨ੍ਹਾਂ ਨਾਵਾਂ ਨਾਲ ਵੀ

  • building completion certificate request
  • completion plan application
  • construction completion approval

ਕਦੋਂ ਲੋੜ ਪੈਂਦੀ ਹੈ

Once construction is complete, use this so the authority records the building matches the sanctioned plan, or departs only as lawfully acceptable. State the sanction, completion date and certifications. Not permission to occupy: Chandigarh requires non-compoundable violations removed first; Punjab runs a similar process.

ਕੀ ਇਹ ਇੱਥੇ ਹੀ ਭਰਿਆ ਜਾ ਸਕਦਾ ਹੈ

ਇਹ ਇੱਥੇ ਹੀ ਭਰਿਆ ਜਾ ਸਕਦਾ ਹੈ

ਇਹ ਦਸਤਾਵੇਜ਼ ਤੁਸੀਂ ਇਸੇ ਸਾਈਟ ਉੱਤੇ ਭਰ ਸਕਦੇ ਹੋ, ਅਤੇ ਕੁਝ ਵੀ ਤੈਅ ਕਰਨ ਤੋਂ ਪਹਿਲਾਂ ਪੂਰਾ ਖਰੜਾ ਸਕਰੀਨ ਉੱਤੇ ਪੜ੍ਹ ਸਕਦੇ ਹੋ। ਇਹ ਧਿਆਨ ਨਾਲ ਤਿਆਰ ਕੀਤਾ ਖਰੜਾ ਹੈ; ਤੁਹਾਡੇ ਆਪਣੇ ਹਾਲਾਤ ਬਾਰੇ ਦਿੱਤੀ ਸਲਾਹ ਨਹੀਂ।

ਇਸ ਨੂੰ ਭਰਨਾ ਸ਼ੁਰੂ ਕਰੋ
ਸਟਾਂਪ ਡਿਊਟੀ, ਰਜਿਸਟਰੀ ਅਤੇ ਗਵਾਹ ਵੇਖੋ

ਹੇਠਾਂ ਜੋ ਲਿਖਿਆ ਹੈ ਉਹ ਪੰਜਾਬ ਅਤੇ ਚੰਡੀਗੜ੍ਹ ਲਈ ਹੈ। ਇਸ ਵਿੱਚ ਉੱਥੋਂ ਦੀ ਹੀ ਸਥਿਤੀ ਦਿੱਤੀ ਗਈ ਹੈ, ਇਹ ਨਹੀਂ ਕਿ ਇਹ ਕਿੱਥੇ-ਕਿੱਥੇ ਕਿਵੇਂ ਬਦਲਦੀ ਹੈ — ਭਾਵ ਹੇਠਲੀਆਂ ਰਕਮਾਂ ਉਹੀ ਹਨ ਜੋ ਲਾਗੂ ਹੁੰਦੀਆਂ ਹਨ। ਦਰਾਂ ਬਦਲਦੀਆਂ ਰਹਿੰਦੀਆਂ ਹਨ, ਇਸ ਲਈ ਸਬ-ਰਜਿਸਟਰਾਰ ਦਫ਼ਤਰ ਤੋਂ ਪੱਕਾ ਕਰ ਲੈਣਾ ਠੀਕ ਰਹਿੰਦਾ ਹੈ। ਜੇ ਪ੍ਰਾਪਰਟੀ ਭਾਰਤ ਵਿੱਚ ਕਿਤੇ ਹੋਰ ਹੈ, ਤਾਂ ਇਸ ਵਿੱਚੋਂ ਕੁਝ ਵੀ ਤੁਹਾਡੇ ਲਈ ਨਹੀਂ ਹੈ।

ਸਟਾਂਪ ਡਿਊਟੀ

No stamp duty: it creates no right in property, so it is not an instrument under section 2(14), Indian Stamp Act, 1899. Print on plain paper; pay only the authority's fee. Any affidavit filed is stamped separately.

ਰਜਿਸਟਰੀ

Not registrable: creates no right in property; section 17, Registration Act, 1908 doesn't apply.

ਨੋਟਰੀ

Not required, unless the authority asks for an affidavit.

ਗਵਾਹ

Not required. The owner's and the professional's signatures suffice.

ਸਟੈਂਪ ਪੇਪਰ ਲਈ ਬੇਨਤੀ ਕਰੋ

Sample preview — placeholder answers, not your data

COMPLETION CERTIFICATE APPLICATION

Application date: 2 April 2026

Applicant: Aarav Sharma, Sector 21, Panchkula, capacity Owner/allottee. Phone: 98765 43210; email: aarav@example.com.

Property: Plot 118, Sector 66, SAS Nagar, Punjab (Residential plot/building), Plot 118, Sector 66; allotment AL-118., site area 836.13 sq m. Title/allotment: Conveyance deed no. 2345 dated 10 June 2022. Jurisdiction Punjab; authority GMADA / competent building authority.

Sanction: BP/2025/118 dated 01 December 2025. Construction completion date: 1 April 2026.

  1. 1. COMPLETED WORK

Completed built-up area: 948 sq m. Floors: 3. Completion drawings: As-built completion plans match sanctioned plans. Departures: Internal partition change on second floor.

  1. 2. STRUCTURE AND SERVICES

Structural completion: Structural engineer certifies construction as per approved structural design. Services: Water/sewer/drainage installations completed. Pending service item: Final sewer connection inspection. Fire: Required fire systems installed and certification/NOC attached or pending final inspection. Site clearance: Construction debris removed and site safe.

  1. 3. PROFESSIONALS

Architect: Ar. Simran Kaur (CA/2012/55555). Structural engineer: Er. Neeraj Khanna (SE/CHD/2024/118).

  1. 4. ENCLOSURES

Completion documents: Completion drawings, architect certificate, structural certificate, service completion records.. Fee status: Paid. Reference: CC-260915-118

  1. 5. REQUEST

Please inspect the completed work and issue the completion certificate or identify the specific remedial, revised-plan, compounding or service action required before completion can be accepted.

LEGAL BASIS

In Punjab the completion certificate is issued under rule 14 and the occupation certificate under rule 23 of the Punjab Urban Planning and Development Building Rules, 2021, by the municipal corporation, council or development authority concerned. On a development-authority site, where the completion or occupation certificate is not obtained within the period allowed, the authority charges an extension fee half-yearly, on a ladder that starts in the fourth year from allotment and runs against the site rather than the person. In Chandigarh a building on an allotted or auctioned site must be completed within three years of the delivery of possession under Rule 8 of the Chandigarh Estate Rules, 2007, with up to five yearly extensions on a penalty of 10%, 15%, 20%, 25% and 30% of the total consideration, after which the Estate Officer may proceed under section 8-A of the Capital of Punjab (Development and Regulation) Act, 1952; the building is not to be occupied until the Estate Office issues an Occupation Certificate.

PERSONAL DATA NOTICE

This notice is given under the Digital Personal Data Protection Act, 2023.

ਇਸ ਦਸਤਾਵੇਜ਼ ਨਾਲ ਅਕਸਰ ਇਹ ਵੀ ਚਾਹੀਦੇ ਹਨ

ਜ਼ਮੀਨ ਦੇ ਰਿਕਾਰਡ, ਮਾਲਕੀ ਦੀ ਜਾਂਚ ਅਤੇ ਮਨਜ਼ੂਰੀਆਂ ਉੱਤੇ ਵਾਪਸ

ਅਸੀਂ ਆਪਣੀਆਂ ਸ਼ਰਤਾਂ ਅੱਪਡੇਟ ਕੀਤੀਆਂ ਹਨ

ਕਿਰਪਾ ਕਰਕੇ ਹੇਠਾਂ ਦਿੱਤੇ ਅੱਪਡੇਟ ਕੀਤੇ ਦਸਤਾਵੇਜ਼ ਪੜ੍ਹੋ ਅਤੇ ਇੱਕ ਵਾਰ ਮਨਜ਼ੂਰ ਕਰੋ, ਤਾਂ ਜੋ ਤੁਸੀਂ ਦਸਤਾਵੇਜ਼ ਲੈ ਜਾ ਸਕੋ ਅਤੇ ਕਿੱਟਾਂ ਖਰੀਦ ਸਕੋ। ਦਸਤਾਵੇਜ਼ ਵੇਖਣਾ, ਭਰਨਾ ਅਤੇ ਝਲਕ ਵੇਖਣਾ ਪਹਿਲਾਂ ਵਾਂਗ ਚੱਲਦਾ ਰਹੇਗਾ।

Completion Certificate Application — ਫ਼ਾਰਮੈਟ | ਕਾਗਜ਼ਨਾਮਾ