ਕਾਗਜ਼ਨਾਮਾ

Commencement Certificate Application

ਇੱਕ ਨਜ਼ਰ ਵਿੱਚ

ਕੀਮਤ
ਮੁਫ਼ਤ
ਸਟਾਂਪ ਡਿਊਟੀ
No stamp duty: it creates no right in property, so it is not an instrument under section 2(14), Indian Stamp Act, 1899.
ਰਜਿਸਟਰੀ
Not registrable: creates no right in property; section 17, Registration Act, 1908 doesn't apply.
ਗਵਾਹ
Not required.

ਮੁਫ਼ਤ

ਦਸਤਾਵੇਜ਼ ਮੁਫ਼ਤ ਹਨ। ਸਿਰਫ਼ ਕਿੱਟਾਂ ਦੇ ਪੈਸੇ ਲੱਗਦੇ ਹਨ।

ਮੁਫ਼ਤ: ਇੱਕ ਦਿਨ ਵਿੱਚ 5 ਦਸਤਾਵੇਜ਼ ਤੱਕ।

ਆਸਾਨ ਸਵਾਲ, ਪੂਰਾ ਡਰਾਫਟ ਸਕ੍ਰੀਨ ਉੱਤੇ, Word ਵਿੱਚ ਡਾਊਨਲੋਡ ਕਰੋ।

ਸਾਰੀਆਂ ਕੀਮਤਾਂ ਵੇਖੋ

ਇਨ੍ਹਾਂ ਨਾਵਾਂ ਨਾਲ ਵੀ

  • construction commencement application
  • commencement notice
  • start-of-work permission request

ਕਦੋਂ ਲੋੜ ਪੈਂਦੀ ਹੈ

Once you hold the building approval, get commencement-stage clearance before starting work. Terminology varies: some authorities issue a commencement/intimation or stage inspection instead of a separate certificate; this covers either.

ਹੋਰ ਪੜ੍ਹੋ

It confirms the lawful start against the sanction. Do not start while a required condition is outstanding.

ਕੀ ਇਹ ਇੱਥੇ ਹੀ ਭਰਿਆ ਜਾ ਸਕਦਾ ਹੈ

ਇਹ ਇੱਥੇ ਹੀ ਭਰਿਆ ਜਾ ਸਕਦਾ ਹੈ

ਇਹ ਦਸਤਾਵੇਜ਼ ਤੁਸੀਂ ਇਸੇ ਸਾਈਟ ਉੱਤੇ ਭਰ ਸਕਦੇ ਹੋ, ਅਤੇ ਕੁਝ ਵੀ ਤੈਅ ਕਰਨ ਤੋਂ ਪਹਿਲਾਂ ਪੂਰਾ ਖਰੜਾ ਸਕਰੀਨ ਉੱਤੇ ਪੜ੍ਹ ਸਕਦੇ ਹੋ। ਇਹ ਧਿਆਨ ਨਾਲ ਤਿਆਰ ਕੀਤਾ ਖਰੜਾ ਹੈ; ਤੁਹਾਡੇ ਆਪਣੇ ਹਾਲਾਤ ਬਾਰੇ ਦਿੱਤੀ ਸਲਾਹ ਨਹੀਂ।

ਇਸ ਨੂੰ ਭਰਨਾ ਸ਼ੁਰੂ ਕਰੋ
ਸਟਾਂਪ ਡਿਊਟੀ, ਰਜਿਸਟਰੀ ਅਤੇ ਗਵਾਹ ਵੇਖੋ

ਹੇਠਾਂ ਜੋ ਲਿਖਿਆ ਹੈ ਉਹ ਪੰਜਾਬ ਅਤੇ ਚੰਡੀਗੜ੍ਹ ਲਈ ਹੈ। ਇਸ ਵਿੱਚ ਉੱਥੋਂ ਦੀ ਹੀ ਸਥਿਤੀ ਦਿੱਤੀ ਗਈ ਹੈ, ਇਹ ਨਹੀਂ ਕਿ ਇਹ ਕਿੱਥੇ-ਕਿੱਥੇ ਕਿਵੇਂ ਬਦਲਦੀ ਹੈ — ਭਾਵ ਹੇਠਲੀਆਂ ਰਕਮਾਂ ਉਹੀ ਹਨ ਜੋ ਲਾਗੂ ਹੁੰਦੀਆਂ ਹਨ। ਦਰਾਂ ਬਦਲਦੀਆਂ ਰਹਿੰਦੀਆਂ ਹਨ, ਇਸ ਲਈ ਸਬ-ਰਜਿਸਟਰਾਰ ਦਫ਼ਤਰ ਤੋਂ ਪੱਕਾ ਕਰ ਲੈਣਾ ਠੀਕ ਰਹਿੰਦਾ ਹੈ। ਜੇ ਪ੍ਰਾਪਰਟੀ ਭਾਰਤ ਵਿੱਚ ਕਿਤੇ ਹੋਰ ਹੈ, ਤਾਂ ਇਸ ਵਿੱਚੋਂ ਕੁਝ ਵੀ ਤੁਹਾਡੇ ਲਈ ਨਹੀਂ ਹੈ।

ਸਟਾਂਪ ਡਿਊਟੀ

No stamp duty: it creates no right in property, so it is not an instrument under section 2(14), Indian Stamp Act, 1899. Print on plain paper; pay only the authority's fee. Any affidavit filed is stamped separately.

ਰਜਿਸਟਰੀ

Not registrable: creates no right in property; section 17, Registration Act, 1908 doesn't apply.

ਨੋਟਰੀ

Not required, unless the authority asks for an affidavit.

ਗਵਾਹ

Not required. The owner's and the professional's signatures suffice.

ਸਟੈਂਪ ਪੇਪਰ ਲਈ ਬੇਨਤੀ ਕਰੋ

Sample preview — placeholder answers, not your data

COMMENCEMENT CERTIFICATE APPLICATION

Application date: 1 April 2026

Applicant: Aarav Sharma, Sector 21, Panchkula, capacity Owner/allottee. Phone: 98765 43210; email: aarav@example.com.

Site: Plot 118, Sector 66, SAS Nagar, Punjab (Residential plot/building), Plot 118, Sector 66; allotment AL-118., area 836.13 sq m. Title/allotment: Conveyance deed no. 2345 dated 10 June 2022. Jurisdiction Punjab; authority GMADA / competent building authority.

Prior approval: BP/2026/118 dated 01 September 2026. Proposed commencement: 2 April 2026. Stage: Site preparation and excavation.

  1. 1. SITE READINESS

Demarcation: Official demarcation completed. Reference: DEM/2026/118 Pre-construction NOCs: All identified pre-construction NOCs obtained. Pending: Tree-felling permission for one roadside tree.

  1. 2. CONSTRUCTION CONTROLS

Contractor/site safety: Contractor and site-safety arrangements are in place. Temporary services: Temporary power/water arrangements sanctioned or safely arranged.

  1. 3. PROFESSIONAL TEAM

Architect: Ar. Simran Kaur (CA/2012/55555). Structural engineer: Er. Neeraj Khanna (SE/CHD/2024/118).

  1. 4. ENCLOSURES

Documents: Sanctioned plans, demarcation, architect appointment, structural drawings..

  1. 5. REQUEST

Please issue the applicable commencement-stage approval, permit confirmation or prescribed notice acknowledgment before work starts, and identify the next mandatory inspection stage.

PERSONAL DATA NOTICE

This notice is given under the Digital Personal Data Protection Act, 2023.

Personal data in this document is collected only to prepare, submit and administer the applicable commencement-stage construction approval or notice, communicate about that purpose, verify expressly supplied property and approval information, and retain an evidentiary application record.

The record will be held by Kagaznama and may be shared only with the applicant, owner, architect, engineer, licensed professional, project consultant, lender, contractor, competent planning/building/fire/environment/water authority, or other person directly involved in the stated approval.

If the application is withdrawn, refused or does not proceed, personal data will be retained for 90 days and then erased. If it proceeds, the record will be retained for the approval/project plus 12 months, except where a statute or authority record-retention rule requires a longer named period.

A person named here may withdraw consent for future consent-based processing, request correction or erasure when the stated purpose has ended, or raise a grievance by writing to privacy@example.com. The record-holder should acknowledge and respond within 30 days.

Data minimisation: this document does not collect a full Aadhaar number, an Aadhaar-card copy, a password or unrelated financial credentials, and none should be written into it. Collect identity and professional-registration details only where the receiving authority actually requires them.

ਇਸ ਦਸਤਾਵੇਜ਼ ਨਾਲ ਅਕਸਰ ਇਹ ਵੀ ਚਾਹੀਦੇ ਹਨ

ਜ਼ਮੀਨ ਦੇ ਰਿਕਾਰਡ, ਮਾਲਕੀ ਦੀ ਜਾਂਚ ਅਤੇ ਮਨਜ਼ੂਰੀਆਂ ਉੱਤੇ ਵਾਪਸ

ਅਸੀਂ ਆਪਣੀਆਂ ਸ਼ਰਤਾਂ ਅੱਪਡੇਟ ਕੀਤੀਆਂ ਹਨ

ਕਿਰਪਾ ਕਰਕੇ ਹੇਠਾਂ ਦਿੱਤੇ ਅੱਪਡੇਟ ਕੀਤੇ ਦਸਤਾਵੇਜ਼ ਪੜ੍ਹੋ ਅਤੇ ਇੱਕ ਵਾਰ ਮਨਜ਼ੂਰ ਕਰੋ, ਤਾਂ ਜੋ ਤੁਸੀਂ ਦਸਤਾਵੇਜ਼ ਲੈ ਜਾ ਸਕੋ ਅਤੇ ਕਿੱਟਾਂ ਖਰੀਦ ਸਕੋ। ਦਸਤਾਵੇਜ਼ ਵੇਖਣਾ, ਭਰਨਾ ਅਤੇ ਝਲਕ ਵੇਖਣਾ ਪਹਿਲਾਂ ਵਾਂਗ ਚੱਲਦਾ ਰਹੇਗਾ।